Saturday, 21 February 2026

Battery powered Trains!

 Filling in gaps between Mainlines?

Beaching in some ways destroyed Britain's railway networks, because of lack of traffic in the 1960's without vision, but today many of these branch and freight lines are being returned to public use!

The battery powered train is the future here for all the new housing projects and the need to connect with other mainlines, as is already at play in west-London with trials completed a small line is now operational and many are to follow?

Only the Newcastle Metro has met the tram-rail as yet, but is to be soon met with the Cardiff city expansion to the valley lines to reinforce commuter traffic to the capital morning and evening and at the weekend for night life!

There are at least one hundred connection that could be made across the U.K. and N-Ireland, if not many other islands that have existing rail or tram lines?

Saturday, 5 October 2024

Buses and Coaches!

 Disabled Access?

We tend to think and lump together the disabled to specialist vehicles, rather than the ordinary fleets that serve towns and cities across the U.K., because of lack of investment!

Most vehicles are designed for the able bodied and they are up to day with technology and comfort, but they are limited to wheelchair access and other to deal or share with those who are disabled?

We want and claim from time to time that we live in an equal society, but that is not true if you are in a wheelchair or struggle to walk or move in a able way!

The lack of investment is common in all forms of transport and yet crossing into Europe it is a different attitude, with provision being made for all on a equal basis and an ever improving set of vehicles and fleets of all type of transport!

Tuesday, 9 October 2018

Rails. Part-One.

Speed and Modernisation?

What is delaying much advancement in railways is outdated signalling, rotting wooden sleepers and old stock management! 

These are some of the facts that are stopping modernisation in the U.K., but its far worse in some places both near and far?

Train development has raced ahead, without considering other key factors that might need to be changed first? Privatisation has much to play in patching up the networks, because governments want to give us a false image of their failures in properly financing the lines infrastructure!

Many promises get left unfulfilled over the years and left to others to deal with or cancel! But where there is serious changes the problems are that they are too late and overcrowding or empty stock remain a problem that causes much more friction!

What is needed is commitment and vision that will be backed up with huge amounts of money and interested parties to keep investing? Consideration for the disabled and getting on with gradual adaptions to meet the needs of wheel chair access, and much more for the blind, not talking and never doing?

Tuesday, 27 March 2018

The Elizabeth Line. Part-One,

Cross Rail.

This ambitious railway project is near completion, but it is already out of date due to the even higher demands on the rail, under and over ground for London! It is estimated that by 2040, even with all the planned extensions of existing lines this will still not meet the requirements for travel?

What is needed is business with vision as was the case in the 19thCentury, but perhaps if Brexit happens we will not get the proper allocation of E.U funding that is being combined now?

The Elizabeth line facilitates east to west travel, but the idea of a north to south is also being considered?

It is only with time that we will see all the pitfalls and good points of this new project, London has so much to offer with existing out of service lines that could be brought back into service and it has much potential if only the greedy could see a way forward instead of bickering?

Tuesday, 19 September 2017

Rail and Tram options. Two.

London Overloaded?

Currently the capital of the United Kingdom is overloaded in relation to pressure on transport needs? Millions is being spent on Cross rail, planned extension's to the Bakerloo Line and the DLR, but this still will not stop the problems of overloading?

Plans are a foot to replace the diesel bus fleet with new Italian Electric buses, some are already in service. But what they lack is capacity and this short term ploy will not really help the situation that worsens daily?

Thames link  has purchased a fleet of plug trains that are walk through, and these are much longer than previous stock, thus much work is underway to make station platforms longer!

The opportunity of extending the tram network in London would help, even if it was based on the original layout?

Cost is not a problem for the capital, but lack of vision is and until some really good city Mayor comes to the fore, things will only get slower and tempers frayed??