New Technology not for Everyone!
The British capital London is introducing charges to cars entering the city that are over fifteen years old or are powered by diesel! But nothing has been mentioned as yet about rail freight that daily passes through the capital power by mighty fuel guzzling locomotives?
Much work is being done to introduce more battery powered trains and improve the electrification of the capital, but this will not be for everywhere and outside London some areas will remain as they are!
Electric power 3rd rail is extensive in urban areas of the U.K., while 4th rail is part of the underground systems in London and Glasgow! Cost was originally the problem, but since the electrification of the Channel Tunnel work is continuing to improve a smoother cleaner train travel!
But most freight locomotion remains operated by diesel, rather than electric and one does not know what or when this will be changed or if it will ever be changed?
Showing posts with label capital. Show all posts
Showing posts with label capital. Show all posts
Tuesday, 9 April 2019
Battery and Electrics?
Labels:
3rd,
4th,
battery,
capital,
car charges,
Channel,
city,
costs,
daily,
Diesel,
electrification,
Freight,
locomotion,
London,
movements,
pollution,
Rail
Tuesday, 19 September 2017
Rail and Tram options. Two.
London Overloaded?
Currently the capital of the United Kingdom is overloaded in relation to pressure on transport needs? Millions is being spent on Cross rail, planned extension's to the Bakerloo Line and the DLR, but this still will not stop the problems of overloading?
Plans are a foot to replace the diesel bus fleet with new Italian Electric buses, some are already in service. But what they lack is capacity and this short term ploy will not really help the situation that worsens daily?
Thames link has purchased a fleet of plug trains that are walk through, and these are much longer than previous stock, thus much work is underway to make station platforms longer!
The opportunity of extending the tram network in London would help, even if it was based on the original layout?
Cost is not a problem for the capital, but lack of vision is and until some really good city Mayor comes to the fore, things will only get slower and tempers frayed??
Currently the capital of the United Kingdom is overloaded in relation to pressure on transport needs? Millions is being spent on Cross rail, planned extension's to the Bakerloo Line and the DLR, but this still will not stop the problems of overloading?
Plans are a foot to replace the diesel bus fleet with new Italian Electric buses, some are already in service. But what they lack is capacity and this short term ploy will not really help the situation that worsens daily?
Thames link has purchased a fleet of plug trains that are walk through, and these are much longer than previous stock, thus much work is underway to make station platforms longer!
The opportunity of extending the tram network in London would help, even if it was based on the original layout?
Cost is not a problem for the capital, but lack of vision is and until some really good city Mayor comes to the fore, things will only get slower and tempers frayed??
Tuesday, 30 May 2017
Construction. One.
Building Cross Rail-Elizabeth Line.
One must say that the use of the crane with telescopic or static has come to its fore, working in the tight spaces of bustling London! Most of the work being done in the capital was underground rather than later structures being build over tube stations to prove the value of land and property.
The crane has been around since man discovered we needed it to build, wither it was structures such as stone Henge to the ancient cities of the Middle-east and the great wall of China. The crane is the best was to lift heavy items, were as the pulley is more for the moving of local smaller weights.
Cross Rail and many other new underground ventures will be dominated by the crane, while the mobile telescopic has taken advantage of those 8x8 ICBM carriers for the odd and quick jobs?
One must say that the use of the crane with telescopic or static has come to its fore, working in the tight spaces of bustling London! Most of the work being done in the capital was underground rather than later structures being build over tube stations to prove the value of land and property.
The crane has been around since man discovered we needed it to build, wither it was structures such as stone Henge to the ancient cities of the Middle-east and the great wall of China. The crane is the best was to lift heavy items, were as the pulley is more for the moving of local smaller weights.
Cross Rail and many other new underground ventures will be dominated by the crane, while the mobile telescopic has taken advantage of those 8x8 ICBM carriers for the odd and quick jobs?
Labels:
capital,
Construction,
Cranes,
Cross rail,
Elizabeth Line,
heavy,
Henge,
lifting,
London,
money,
property,
pulley,
smaller,
spaces,
tight,
weights
Tuesday, 28 April 2015
Trams for Wales.
Cardiff Proposed.
The return of trams to the capital Cardiff is under consideration, wither it will happen or not who knows? But trams for Swansea and many other large towns with hills would be a viable transport need worth looking into.
Since it was Swansea where the concept of the first tram and tramway were born! Today the re-introduction of light rail across the United Kingdom and the British isles has been very profitable as has world wide.
Simple to run and attractive to the eye, they fill the gap between buses and mainline trains or metro/tube systems.
The return of trams to the capital Cardiff is under consideration, wither it will happen or not who knows? But trams for Swansea and many other large towns with hills would be a viable transport need worth looking into.
Since it was Swansea where the concept of the first tram and tramway were born! Today the re-introduction of light rail across the United Kingdom and the British isles has been very profitable as has world wide.
Simple to run and attractive to the eye, they fill the gap between buses and mainline trains or metro/tube systems.
Subscribe to:
Posts (Atom)